Tuesday, December 31, 2019

EROSION AND SEDIMENT CONTROL PLAN

Erosion And Sediment Control Plan (ESCP) is a plan that details temporary measures that will be implemented during the construction phase and may include permanent measures that will remain in place once development is complete to control the environmental impacts of erosion and sedimentation.
It is important that Erosion And Sediment Control Plan is effective in preventing illicit discharge. Careful examination of the specific project site during project design to identify potential problems posed by slope, drainage patterns, and soil types is important in preparing an effective erosion and sediment control plan.
Erosion And Sediment Control Plan as part of the plan set with the planning and/or building permit application submittal. For projects including those requiring a Grading Permit, separate erosion and sediment control plans are required to show the measures to be implemented at the grading stage (e.g., grading, foundation/retaining walls) and at the construction stage of the project.

The plan shall show what Best Management Practices (BMPs) will be used, when, and where, specific to the project scope, along with the total disturbance area and installation details and notes for the proposed BMPs. Measures include those necessary to delineate areas of work/disturbance, prevent erosion of unstable or denuded areas, plan for construction staging and storage logistics, construction of stabilized access points, and proper containment measures for construction materials and waste.
Erosion and Sediment Control Plan shall show:
  • Boundary lines of the site.
  • Limits of disturbed areas.
  • Existing drainage patterns and direction of flow.
  • Accurate contours showing the topography of the existing ground. The contour lines shall be at intervals sufficient to show the configuration of the ground before disturbance.
  • The location of all existing buildings, structures, easements, or underground utilities.
  • Concrete Washout
  • Fiber Rolls
  • Geotextiles and Mats
  • Inlet Protection
  • Silt Fence
  • Stabilized Construction Entrance
  • Stockpile
  • Tree Protection
If you are keen to find out more about how our firm can work with you to complete your Erosion And Sediment Control Plancontact us today. You can fill out our online form or contact us via contact@civiloutsourcing.com. When cost-effectiveness and quick turnaround are important, and quality cannot be sacrificed, turn to Civiloutsourcing.com services for Erosion And Sediment Control Plan.
Contact us:
Email: contact@civiloutsourcing.com
Phone: +84 90-601-3469
Address: 537/39, Nguyen Oanh Street, Go Vap District, Ho Chi Minh City, Vietnam.

No comments:

Post a Comment

HOW TO REDUCE YOUR WORKLOAD BY OUTSOURCING SERVICES?

06 Jan Does outsourcing help you in easing your burden of work? Will outsourcing make you more relaxed? To answer such questions is not easy...